Shiny New Wood.
Here’s the kitchen as of this morning. The guy who measures the cabinets for the granite will be here in a half-hour, and it’ll take a week and a half for them to cut it and come back out to install. In the meantime, the plumber will be here tomorrow to put the gas line, disposall, and range in, as well as widen the drain pipes from 1.5″ to 2″.
Meanwhile, we picked up a faucet from the Lowe’s (the selection there, while large, was underwhelming) and the aforementioned disposal last night—nothing like the last minute, eh?
Finally, we have to return to IKEA this weekend to pick up 20+ drawer pulls (we’re going with the TAG model, which is sort of an elegant stainless swoop.)


4 Comments